Ordered the RAM sticks. According to the store they’re on backorder and should arrive in one or two months. Hopefully they actually arrive. And doesn’t take two months.
It’s the most annoying part because barely anyone sells what I want and most of them are stupid overpriced.
On another note, I’ve gotten the all in one server. Should arrive sometime this week.
Accompanying the server, I also secured the drive bay converter and SATA (SAS) controller.
I can then proceed to put it in service once everything arrive. Starting from basic check, reflashing the controller, updating BIOS, and swapping parts. Need to take out 1230v2 from office desktop.
I’m thinking of doing everything at once after the basic preparation is done so I can minimize downtime. It’ll be my router after all. And web server. And storage server. Everything~
If there’s no problem, I’ll continue finishing new office desktop and swapping parts for end state of office server.
That will conclude the most troublesome parts. Assuming everything works as planned, that is.
Sure hope there’s no problem with new Ryzen system~
I will probably end up getting a new SSD though. Or not. We’ll see.